Under the title "new splendor for Stuttgart icon", an article appeared in "Immobilienmanager" at the beginning of June about the renovation of the Stuttgart Schlosshotel. Together with the landscape architecture office Planstatt Senner, Steimle Architekten won the competition to renovate the facade and revitalize the first floor zones. Honorary president of the Baden-Württemberg Chamber of Architects and chairman of the building commission appointed by LBBW for the Schlossgartenquartier Wolfgang Riehle expressed his response:
"The result of this competition confirms our conviction that the identity-creating design quality of the Hotel am Schlossgarten can form the basis for a further life cycle while retaining its essential architectural features."
You can read the article from Bianca Diehl here.
The sports- and multifunctionalhall in Wangen im Allgäu is slowly taking shape. The wooden hybrid building impresses especially with its playful, simple facade. Actually during the construction phase, the hall gives the impression of a friendly, open building that will soon motivate students and hobby athletes to exercise.
In Überlingen, the shell for the new fire station is being stripped. The concrete exterior walls are already in place, and the round canopy of the fire station will follow in the next few weeks.
On Dresdner Ring in Backnang, the floors of most of the residential buildings have now been raised. In the grey weather, the cubes still look a little drab, while the façade and interior life is still missing. But with a bit of imagination, you can already guess how life will move into the living rooms and people will drink their after-work beer on the balconies, soon.
The competition for the district office of the future in Wuerzburg was already decided in the beginning of 2022. Now we are working on the development. In April Thomas Steimle represents the project in front of the distriv administrator and the stuff of administration. The new district office should be citizen friendly and sustainable. With its well-connected location and attractive office space, it should not only offer a well-organised office but also attractive workplaces.
Steimle Architekten was ranked 11th in the field of architecture and 14th in the field of urban planning in the 2022 competionline ranking. With four first prizes, one third prize and a recognition in 2022, we are pleased with the ranking and would like to thank our successful competition team, which was thus able to convince in more than every second competition submitted.
The façade of the new SWR broadcasting building in Mannheim is hidden behind full scaffolding. The façade has been completed up to the third floor, the upper two floors are still missing. The curtain-type aluminium pilaster strips, which already gave the façade its light, playful dress in the competition, will be installed in the summer. The antenna of the new studio is already mounted on the roof, so the "gateway to the world" is already in place.
The fire station in Germersheim has been completed and will be occupied by the local fire brigade this month.
The Fulda Rescue Control Centre receives the Simon Louis du Ry plaque. The BDA Hessen awards the prize every five years under the title "Large Houses, Small Houses - Excellent Architecture in Hessen 2018-2023".
The Ost Hessen journal quotes from the statements of the expert jury :
The jury was very taken with the Fulda projects. For example, it judged the control centre: "The rescue control centre is characterised by an independent expression that results from the diagonally positioned lanes on the ground floor and was thus conclusively developed from its use. The chosen exposed concrete construction gives the building a sculptural and resistant expression that is appropriate for its use. Inside, complex utilisation structures are skilfully organised in a very clear floor plan. The building is not only to be mentioned as a successful extension of an industrially influenced building ensemble, but also as a reference for future vehicle halls."
More about the prize in the Ost Hessen journal
Thejournal of fuldainformed.
On the former AEG construction site in Nuremberg, the shell for the Technical University is in full swing. Up to four storeys are already rising above the ground. Some of them already have staircases, but otherwise they are still pretty rough. A closer look, however, even gives us a glimpse of the future hydraulic engineering laboratory.