2020-10-21

Thomas Steimle is the new vice chairman of the BDA BW

The Association of German Architects BDA, State Association of Baden-Württemberg, has elected a new state board at its general meeting on 16.10.2020 in Göppingen.
The new Vice Chairman is Thomas Steimle, Stuttgart, who has been a member of the BDA state board since 2014 and succeeds Michael Jöllenbeck, Walldorf.

Into the federation of German architects BDA are appointed free architects, who are characterised by above average vocational qualification. 950 members in 15 district groups in Baden-Württemberg are engaged professionally and voluntarily for the quality of planning and building in responsibility towards society.

2020-10-09

Umweltbank Nuremberg

The winners of the architectural competition for the new headquarters of the UmweltBank have been determined. The sustainable office building in Nuremberg is to set trendsetting accents.
In the Europe-wide architectural competition, the jury has now awarded the prize winners. In addition to urban planning and architectural aspects, the sustainability of the designs played a decisive role.

2020-10-08

Residential and commercial building Berlin published on German Architects

The online magazine German Architects published an interview with Thomas Steimle on the project residential and commercial building in Berlin.

Link to article

2020-09-30

1st prize for a new sports hall in Wangen

1st prize competition
The jury, chaired by Peter W. Schmidt, architect from Pforzheim, awarded the first prize to Steimle Architekten, two second prizes and three mentions. The local press »die schwäbische« reported on the successful architectural competition

Evaluation by the jury
"The editors of this work propose an almost square building structure which, due to its settlement and its small size, creates very well usable exterior spaces and references. It communicates with its foyer, which is located in the north, and which, through its three-sided transparency, creates an interior reference both to the east to the fairground and the city center, and to the west to the town hall and the commercial school. In terms of urban planning, this creates the necessary forecourt so that the space can be used and experienced as a campus for the various schools. Towards the south, the authors propose a square design that integrates the street that crosses this space and makes it appear as a unified square through placemats and greenery. ...
...The façade appearance described by the authors themselves as rational aesthetics is created by a larch wood construction placed in front of the actual supporting structure. The facades are alternately generously transparent or closed, depending on the use behind them. This interplay of alternating top and bottom, open and closed, gives this building its own distinctive quality note. The work captivates by its outstanding detailing, which however must be consistently maintained even in the attitude shown here".

2020-09-28

2nd place in Besigheim

We are pleased that our competition entry for the Friedrich Schelling School in Besigheim has been awarded the 2nd prize and wish the winners every success in their implementation!

2020-09-18

Construction site update: fire station in Fulda

The new fire station in Fulda is making progress - soon the work will continue in the interior spaces.

link to project

2020-09-14

The aesthetics of reduction - an interview with Thomas and Christine Steimle

The online magazine of the database for materials "Raumprobe" interviews Thomas and Christine Steimle.

link to article

2020-09-11

Kressbronn library shortlisted for the Dezeen Awards 2020

The library in Kressbronn is one of five projects shortlisted for the Dezeen Awards 2020 in the category "rebirth projects"

Link to vote

2020-09-08

Remchingen Town Hall published on Divisare

The Italian online publication Divisare published the Remchingen Town Hall on their homepage and in the online journal.

link to article

link to project

2020-09-03

Construction site update: Visitor Center Bernau

The first wall is finished, revealing the wooden relief in the concrete.

More news