Task of the competition was to bundle the new fire station, the local DRK association and the rescue station Herbolzheim at a new location and to create new synergies. The jury was impressed by the urban structure of the three areas and the internal structure and organization.
extract from the protocol
"The design is characterized by the fact that structural and architectural aspects depending or resulting from one another. The diagonal structure generates an extremely exciting arrangement of the building in the direction of the roundabout and Rheinhausenstrasse. ...
... In a comparison of all works, the design shows the most compactness. The construction, which can almost be described as modular, suggests an economical solution for the construction.
... The design completely matches the requirements formulated by the sponsor with minimal compromises. The functional conception, the architectural language and the urban planning concept are an excellent solution."
firestation herbolzheim